Similar Projects
Huron Outfall Storm Pipe Project
Infrastructure
Bidding
CO

Ridgegate East Filing Number 1 Street and Utilities Project
Infrastructure
Bidding
Lone Tree, CO 80124

Brighton PWQ Structure Installation
Post-Bid
Less than $100,000 est. value
Brighton, CO 80601

Bay at the Landings Storm Sewer Inlets Replacement
Post-Bid
Evans, CO 80620

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

26th Ave Storm Sewer Construction
Results
Edgewater, CO

Reunion Commercial Center Filing 1 District
Infrastructure
Bidding
Commerce City, CO 80022

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

2020 Sewer Line Rehabilitation
Results
Clifton, CO 81520

Reunion Center Duet Phase District Improvements
Infrastructure
Bidding
Commerce City, CO 80022

Wastewater Utility Services - FCC Florence
Post-Bid
Florence, CO 81226

Utility Infrastructure System Improvements and Rehabilitation On-Call
Results
Fort Collins, CO 80522

West Junction Metropolitan District Public Infrastructure
Infrastructure
Bidding
Grand Junction, CO

Alley and Stormwater Improvements Project 2021
Infrastructure
Post-Bid
Crescent, CO

5th Street Storm Sewer
Results
Delta, CO 81416

Reported 01/08/2022 12:00 AM
Project Title

Reunion Underdrain Maintenance Phase 1

Physical Address View project details and contacts
City, State (County) Centennial, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of videoing of approximately 6,180 LF of existing underdrain mainline and approximately 18 cleanouts to determine necessary maintenance to the system for the Reunion Metropolitan District. The project is generally located in Commerce City, CO along E. 108th Ave., Fairway Dr., Nucla Ct., Nucla St. and Parkside Drive South. Maintenance improvements include pumping water out of the underdrain, CCTV video of the existing mainline and cleanouts, cleaning the line by flushing, jetting, vacuuming, or other means necessary, locating & removing cleanout access lids, traffic control, and permitting associated with the work. Some cleanouts are in manhole accesses with sweep connections to the mainline while older cleanouts are in smaller square accesses with tee connections to the mainline.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents