Similar Projects
Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Camino Intertie Pressure Reducing Station
Infrastructure
Bidding
$650,000 to $700,000 est. value
Placerville, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Relief Wells Inspection and Rehabilitation, Phase II
Infrastructure
Bidding
Sacramento, CA 95815

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Constructing Pipeline and Pump Station Project
Infrastructure
Bidding
Bakersfield, CA 93314

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Reported 11/05/2021 12:00 AM
Project Title

Southern Pump Station Project

Physical Address View project details and contacts
City, State (County) El Centro, CA 92244   (Imperial County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $6,200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Southern Pump Station Project WORK includes but is not limited to: Installation of Romtec prefabricated wastewater pump station and valve vault Installation of Romtec prefabricated controls building, generator and odor control unit Installation of associated electrical, controls and gas service Site grading, paving, fencing, landscape and irrigation and water service Construction of new 8" to 21" diameter gravity sewer pipeline including tunneling under the Union Pacific Railroad and IID facilities Construction of a 14" diameter forcemain Decommission of existing Countryside pump station, Countryside South pump station and 4th and Wake pump station Note: the above work includes all phases as shown in the construction documents. The site of the work is located at 102 E. Dannenberg Drive, El Centro, CA on the northeast corner of the intersection of Dannenberg Drive and Farnsworth Road, along Dannenberg Drive, Beverly Lane, Willow Bend Drive, Farnsworth Road, Valor Lane and through an easement in Desert Trails property

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents