Similar Projects
Reported | 11/22/2019 12:00 AM |
Project Title | Airport Planning and Engineering Consultants |
Physical Address | View project details and contacts |
City, State (County) | Foley, AL 36536 (Baldwin County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will provide for the rehabilitation of the North Apron connecting Taxiway A to the hangars located on the North Apron. The rehabilitation will include milling approximately 1 inch and a nominal 2 inches of HMA, crack/joint sealing, shoulder redressing, and markings. The nominal thickness of 2 inches is expected to correct grade deficiencies. The existing pavement condition of the apron is projected to have an estimated PCI below 60. This project will also include the removal of two connector taxiways that allow direct access from the North Apron to Runway 18/36. Direct access from an apron to a runway creates potential for pilot confusion and hazardous runway incursions. A new connector taxiway will be constructed. The new taxiway will be designed and constructed with the new taxiway fillets required by FAA AC 150/5300-13A. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |