Similar Projects
Cherrydale Lake Rehabilitation Project
Infrastructure
Bidding
Mechanicsville, VA 23111

Pipe Replacements Under Route 695
Infrastructure
Bidding
$1,249,000 est. value
VA

Kessler Mill Drainage Improvements
Post-Bid
Salem, VA

Mill Street Drainage Improvements
Post-Bid
Dayton, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Lynnhaven River Basin Ecosystem Restoration, Phase 1 Reef Habitat
Results
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

Aetna Willis Shaft - Feature 2
Infrastructure
Bidding
Midlothian, VA 23113

Z--COLO 253093 York River Shoreline Stabilization 2B
Post-Bid
$10,000,000 est. value
Yorktown, VA

Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Results
$25,000,000 to $100,000,000 est. value
Portsmouth, VA

Honaker Avenue Drainage Improvements
Bidding
Norfolk, VA 23502

Water Management Infrastructure
Post-Bid
Suffolk, VA 23434

On-Call Pipe Rehabilitation and Repair
Results
Less than $701,000 est. value

Hamilton Maintenance II Project
Infrastructure
Bidding
Wise, VA

Drainage Repairs at Paul D. Camp Community College, Franklin Campus
Post-Bid
Franklin, VA 23851

Construction of Ashville Park Drainage Improvements Phase I
Results
Virginia Beach, VA

Last Updated 12/13/2021 10:37 AM
Project Title

Collins Hollow Drainage Project

Physical Address View project details and contacts
City, State (County) Wise, VA 24293   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In summary, the scope of work shall consist of mobilization of the contractor’s workforce and equipment, construction site preparation, installation of erosion and sediment controls, upgrade of a permanent culvert pipe, construction of a vegetated/grass lined ditch, , installation of mine portal seals both with wet seals and utilization of soda ash briquettes for treatment of impounded mine water, construction of underdrains, excavation and regrading, installation of cable concrete on a steep slope conveyance and drainage ditch, revegetation and clean up and repair of damage to the project site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents