Similar Projects
Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Bobolink Road
Infrastructure
Post-Bid
Lowell, WI

Snow Plowing/Winter Maintenance
Term Contract
Post-Bid
Kekoskee, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Improvements
Results
Lomira, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface
Infrastructure
Design
$250,000 CJ est. value
Iron Ridge, WI 53035

Lowell - Hartford
Infrastructure
Bidding
$12,000,000 CJ est. value
Clyman, WI 53039

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Last Updated 02/06/2023 06:04 PM
Project Title

Cityview 2nd Addition - Phase 2

Physical Address View project details and contacts
City, State (County) Horicon, WI 53032   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $824,096 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 6, 2023, construction commenced shortly after being awarded and is expceted to be completed in 2023, however, an exact timeline for construction has not been confirmed. The principal items for which proposals are invited are: 1,045 LF Sanitary Sewer Main, 8-inch 805 LF Sanitary Sewer Lateral, 6-inch 855 LF Water Main, 8-Inch PVC 330 LF Water Main, 6-Inch PVC 805 LF Water Service Pipe, 1-1/4-Inch HDPE 795 LF Storm Sewer Main, 12-Inch to 18-Inch 2,500 LF Concrete Curb and Gutter, 30-Inch 7,475 SF Concrete Sidewalk 2,610 TN Aggregate Base Dense, 3" 1,370 TN Aggregate Base Dense, 1-1/4" 1,435 TN Hot Mix Asphalt Pavement, 4-Inch 5,320 SY Topsoil and Seeding The work to be completed by the Substantial Completion date includes Installation of the underground utilities, including the sanitary sewer, watermain, and storm sewer, along with associated laterals to the adjoining property line. The unclassified excavation of roadways, associated grading, and installation of aggregate base course material for the roadways shall also be completed. The work to be completed by the Final Completion date includes: Installation of concrete curb & gutter, driveway approaches, & sidewalk. Installation of both the lower and upper courses of asphalt pavement. Site restoration. Project shall be completed, acceptable by the City of Horicon, and ready for use.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents