Similar Projects
Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Miscellaneous Roadway Structure Repairs
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

MD 42 (Friendsville Road) Buffalo Run Structure to 11010 to PA State Line Safety and Resurface
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
MD

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Hot Mix Asphalt
Infrastructure
Post-Bid
Oakland, MD

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Resurface Asphalt Campus Wide at Garrett Children`s Center and Backbone Mountain Boys Camp
Results
$500,000 to $1,000,000 est. value
Swanton, MD 21561

Pavement Maintenance
Term Contract
Results

Fair Hill NRMA Phase 4 Paving
Results
Less than $50,000 est. value
Elkton, MD 21921

Street Repair Services
Alteration
Results

Paving
Infrastructure
Results
Accident, MD

High Friction Surface Treatment of Roadways at Various Locations - Statewide
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Last Updated 05/06/2022 08:13 AM
Project Title

Safety and Resurface I-68 (National Freeway) EB from 1.01 Mile West of MD 546 to Allegany County Line

Physical Address View project details and contacts
City, State (County) MD   (Garrett County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing Of i-68 Eastbound And Safety Improvements Of i-68 From 1.01 Miles West Of Md 546 To The Allegany County Line. The Work Will Consist Of The Following:(a) Partial Depth Patching; (b) Milling And Resurfacing; (c) Traffic Barrier Replacement; (d) Shoulder Rumble Strip Replacement; (e) New Reflective Pavement Markings; (f) Post Mounted Delineators; (g) Repair Of Existing Manholes; (h) Removal Of Rock Slide Material; (i) Installation Of Underdrain

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 07 - Thermal and Moisture Protection, Expansion Control, Joint Slide Bearings.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Delineators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents