Similar Projects
Reported | 12/22/2020 12:00 AM |
Project Title | Replacement of Switch Gear to Flood Water Pump Station #6 |
Physical Address | View project details and contacts |
City, State (County) | Ironton, OH (Lawrence County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The control panel supplied will use the existing float system, a new analog radar type level transmitter and motor current to control stopping and starting of the pumps. The operator will be able to start and stop each pump individually or place a pump into automatic mode from an Allen Bradley PanelView HMI. The operator can choose which level device to control the starting and stopping of the pumps. The operator will able to choose the order in which the pumps are started in. The control hardware will be on an Allen Bradley Compactlogic PLC system. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |