Similar Projects
Holiday Inn / Flagstaff
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Flagstaff, AZ 86004

Aura Flagstaff
New Construction
Design
$45,000,000 est. value
Flagstaff, AZ 86001

Babbitt Ranch Wind
New Construction, Infrastructure
Design
$39,500,000 CJ est. value
Williams, AZ 86046

Substance Abuse and Residential Facility
New Construction, Infrastructure - 6,000 SF
Bidding
$2,743,152 CJ est. value
Page, AZ 86040

Flagstaff-Holbrook-Lupton Hwy (I-40) (I-40;Various Locations)
Infrastructure
Sub-Bidding
$916,000 CJ est. value
Flagstaff, AZ 86004

GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Grand Canyon, AZ 86023

RFQ D/B - Flagstaff Ranger District (FRD) Main Office Electric Design and Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Flagstaff, AZ 86004

Public Works Facility
New Construction, Infrastructure
Results
$4,438,617 CJ est. value
Page, AZ 86040

Rebid - Dine' College Gorman Classroom Building Structural Remediation
Renovation, Infrastructure
Results
$450,000 CJ est. value
Tsaile, AZ 86556

Park Place - Sedona
New Construction - 1,083,660 SF
Construction
$10,000,000 CJ est. value
Sedona, AZ 86336

Elara at the Sawmill
New Construction - 431,452 SF
Construction
Flagstaff, AZ 86001

Route 89 Self-Storage
New Construction, Infrastructure - 10,000 SF
Pending Verification
$2,000,000 CJ est. value
Flagstaff, AZ 86004

AutoZone #2782 / Flagstaff
New Construction, Infrastructure - 8,000 SF
Design
$1,500,000 CJ est. value
Flagstaff, AZ 86004

Multi-Discipline Academic Research Science Technology Engineering and Math (STEM) Building Project Phase I Project
Demolition, New Construction, Infrastructure - 180,000 SF
Post-Bid
$130,000,000 CJ est. value
Flagstaff, AZ 86011

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Last Updated 09/30/2022 07:07 PM
Project Title

RFP D/B - 4-plex, 48 Apartments

Physical Address View project details and contacts
City, State (County) Tuba City, AZ 86045   (Coconino County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Invitations are open to all qualified firms. The selection of the firm shall be made in accordance with the Navajo Nation Business Opportunity Act, 5 N.N.C. 201 et seq., as applicable, and the selected firm shall comply with all applicable laws, rules, and regulations of the Navajo Nation.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents