Similar Projects
Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Construction Of The Old Lyme Shared Sewer Infrastructure At Pump Station
New Construction
Post-Bid
Manchester, CT

Route 133 Pump Station Improvements
Results
Brookfield, CT

Old Lyme Associations Pump Station
New Construction
Post-Bid
Old Lyme, CT

Construction of Raymark Stormwater Pumping Station, Stratford, Ct
Results
Stratford, CT

Gulf Street Sanitary Pump Station Repairs
Results
Milford, CT 06460

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Goss Cove Pump Station Improvements
Results
Groton, CT 06340

Water Pollution Control Authority Phase I Pump Station Upgrades
Results
$3,200,000 est. value
Hebron, CT 06248

Pump Repair at Meadow Hill Pump Station
Results
$15,000 to $35,000 est. value
East Hartford, CT 06108

Evergreen Avenue and Blue Hills Pump Stations HVAC Improvements
Results
Waterford, CT 06385

Gravel Street Pump Station Electrical/Mechanical Upgrades
Results
Groton, CT

Last Updated 10/20/2021 06:15 AM
Project Title

South Hartford Conveyance and Storage Tunnel - Tunnel Pump Station Contract No. 3

Physical Address View project details and contacts
City, State (County) Hartford, CT   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for construction of a Tunnel Pump Station (TPS) and Control Building, Grit/Screening Facility, Odor control facility, Head tank, and 54-inch force main, along with support equipment and accessories as shown and specified.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents