Similar Projects
ADF-SW Parking Lot Expansion
Term Contract
Design
Las Cruces, NM

127Eax22r0005 - Nmdot Catwalk Restoration
Demolition, Term Contract
Bidding
$100,000 to $250,000 est. value
Glenwood, NM

Solid Waste Facility - Drainage Improvements Project
Infrastructure
Bidding
Las Vegas, NM

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

NM FTFW RIMO 10(1) Rio Mora National Wildlife Refuge Road & Visitor Parking Rehab
Post-Bid
$1,500,000 to $2,500,000 est. value
Watrous, NM

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Coal Avenue Event Street Project
Results
Gallup, NM 87301

City Wide, On-Call Sidewalk Construction Services 2022-1
Term Contract, Infrastructure
Bidding
Albuquerque, NM

Quartz Hill Trail Project
Post-Bid
NM

Asphalt Overlay at the Bie-T`Siya Day School, Zia
Results
$25,000 to $100,000 est. value
Zia Pueblo, NM

Telshor Avenue ADA Improvements Phase V
Post-Bid
Las Cruces, NM 88011

El Camino and River Walk Pedestrian and Bicycle Paths Project
Results
Las Vegas, NM 87701

Rail Yards Streetscape Project
Infrastructure
Post-Bid
Albuquerque, NM 87102

Canyon Rim Trail Underpass Project
Results
Los Alamos, NM 87544

Acequia Trail Extension from Rufina Street to San Felipe Road
Infrastructure
Post-Bid
Santa Fe, NM

Last Updated 04/04/2022 07:39 AM
Project Title

Bike Pedestrian Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88001   (Dona Ana County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include the mill and inlay of Walnut Street and Madrid Avenue. The bike and pedestrian improvements will include new curb and sidewalk in most areas. Signing and striping will be provided to accommodate bicycles in a 5’ lane along side traffic. Kilmer, Ash and Evelyn Streets will be limited to striping and signing improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents