Similar Projects
Jack Britt High School Chiller Replacement
Alteration
Bidding
Fayetteville, NC 28306

HVAC System Upgrade Phase 3 at South View Middle School
Alteration
Bidding
$2,000 to $30,000 est. value
NC 28348

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

Douglas Byrd Middle School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Douglas Byrd High School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Seventy-First High School, Kitchen HVAC Addition
Results
Fayetteville, NC 28304

Gray's Creek Dehumidifiers 2021
Alteration
Bidding
Hope Mills, NC 28348

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

Reported 11/16/2021 12:00 AM
Project Title

T.C. Berrien Office A/C 2021

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $2,000 to $30,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors are to install one 3 ton Fujitsu or Daikin multi zone mini split heat pump with two 9000 BTU and two 7000 BTU cassette type air handlers. Contractors will install the cassette type air handlers in the center of each room. Condenser will be mounted on a pre fab wall bracket that is rated for its weight. Brackets are to be installed according to manufacturer specifications. Contractor will run power wire from panel C to the disconnect box with new conduit as needed. Contractor to install new control power wire, line set and drain that will be covered with approved cover and installed in a straight, squared manner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents