Similar Projects
District Wide Bridge Rehab Group P
Infrastructure
Conception
$8,129,000 est. value
Schwenksville, PA

Sr 1001 Over Tributary To Susquehanna River - 5356779
Renovation
Conception
$325,000 est. value

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

Waverly Rd over Tacony Creek
New Construction, Demolition
Design
$1,760,000 est. value
Wyncote, PA 19095

Replacement of Bridge 6 - Mill Creek Road Bridge Over Mill Creek
Renovation
Bidding
$2,000,000 est. value
Gladwyne, PA 19035

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Major Bridge P3
New Construction
Post-Bid

Alderfer Road (T-423) Bridge Replacement Project
Results
$2,000,000 to $2,500,000 est. value
Harleysville, PA 19438

Manayunk Road Bridge Replacement
Results
$700,000 to $750,000 est. value
Bala Cynwyd, PA

Green Ln/Belmont Aveune o/ Schuylkill River
Renovation
Conception
$20,086,000 est. value
Harleysville, PA

PA611 - Old York Road/SEPTA
New Construction
Design
$11,106,000 est. value
Jenkintown, PA 19046

Pulaski Drive Bridge Replacement
Infrastructure
Post-Bid
$900,000 to $1,400,000 est. value
Blue Bell, PA

Lincoln Avenue Bridge Replacement Project
Results
$900,000 to $1,250,000 est. value
Hatfield, PA 19440

Southwest Of Euclid Bridge
New Construction
Design
$2,139,878 est. value

Rosenberry Road Bridge Repair
Renovation
Results
Gilbertsville, PA

Last Updated 07/06/2022 07:52 AM
Project Title

Tookany Creek Trail Phase 3

Physical Address View project details and contacts
City, State (County) PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of the construction of a 130' long prefabricated steel pedestrian bridge with concrete deck over Tookany Creek, including bridge abutments and stone access paths and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION TCB, in MONTGOMERY COUNTY CHELTENHAM TOWNSHIP from approximately HARRISON AVENUE at segment 0000 offset 0000 to approximately NEW SECOND STREET at segment 0000 offset 0000.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents