Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Future Fire Station
New Construction
Conception
$20,000,000 est. value
McKinney, TX 75071

Fire Station 6
New Construction - 22,619 SF
Design
$9,945,000 est. value
Allen, TX 75013

Fire Department Administration Building Facility
New Construction - 76,000 SF
Design
$43,200,000 est. value
McKinney, TX

Fire Station 11
Renovation
Post-Bid
McKinney, TX 75070

New Central Fire Station and Administration Facility
New Construction - 28,000 SF
Post-Bid
$14,300,000 est. value
Prosper, TX 75078

Construction Manager-at-Risk for the Town of Prosper Public Safety Complex, Phase 2
New Construction - 28,000 SF
Results
Less than $14,300,000 est. value
Prosper, TX

Fire Station 3 CMAR
New Construction
Results
$12,500,000 est. value
Celina, TX

Virginia & Hardin Fire Station
New Construction
Conception
$14,050,000 est. value
McKinney, TX 75071

Fire Station 8 Reconstruction
Renovation
Design
$12,250,000 est. value
McKinney, TX 75070

Fire Station 2
New Construction
Post-Bid
Princeton, TX 75407

Police Building Phase 1 - CMAR
New Construction
Results
$13,700,000 est. value
Celina, TX

Anna Fire Station #2
New Construction
Conception
Anna, TX

Construction Manager at Risk For Police Department Renovation
Renovation
Post-Bid
Frisco, TX

McKinney Fire Department Headquarters
New Construction
Results
McKinney, TX

Last Updated 01/07/2022 11:47 AM
Project Title

Joint Use Police Substation Remodel Project

Physical Address View project details and contacts
City, State (County) Plano, TX 75025   (Collin County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,159,615
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 2,600 square feet of major renovation and approximately 10,200 square feet of minor renovation. Some areas of minor renovation will be occupied for much of the project. The major renovated area consist of removal of all finishes, the floor slab, removal of some sub-grade soil, installing a micro pile system to support a new slab on void floor system. The major renovated area includes replacing the finishes and systems in the existing locker rooms and briefing area. The areas of minor renovation include renovation of finishes and some systems in office areas. Trades utilized may be: demolition, micro piles, concrete, framing, carpentry, cabinetry, waterproofing, doors, frames, door hardware, drywall, ceramic tile, suspended ceilings, resilient flooring, carpet tile, painting, signage, toilet compartments, toilet accessories, AED’s, fire extinguishers, duty lockers, plastic lockers and benches, fire protection, plumbing, HVAC, electrical, data cabling and audio visual systems.

Details

Fire/Police Station, Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 21 - Fire Suppression, Fire Pumps.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents