Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Bidding
Denver, CO

Flying Horse Pond 1 Retrofit
Infrastructure
Bidding
Colorado Springs, CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Detention Pond Improvements
Post-Bid
Golden, CO

Centennial Center Park Drainage Construction
Results
Centennial, CO 80112

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

Possum Gully Channel Improvement Project
Infrastructure
Bidding
Denver, CO 80249

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Derby Hill Park Drainage and Hardscape Improvements
Results
Less than $100,000 est. value
Loveland, CO

Manitou Springs Fire Station Driveway Demolition and Replacement
Demolition, Infrastructure
Bidding
Manitou Springs, CO 80829

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

C-470 Noise Wall West of Lucent, C-470 Noise Walls, C-470 Trail Replacement
Results
$1,000,000 to $5,000,000 est. value
CO

PUB Landside Drainage Improvements Project
Alteration
Bidding
Pueblo, CO 81001

2020 Mount View Drainage Improvements Program
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 06/18/2021 04:50 PM
Project Title

2021 Ditch Cleaning Project

Physical Address View project details and contacts
City, State (County) Gunnison, CO   (Gunnison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

. The contractor will be responsible for digging out and cleaning ditches throughout the city. Contractor must supply the equipment and labor for the work. The equipment must include a mini excavator and a dump truck. The contract consists of approximately 80-100 hours of work to begin on or about April 5, 2021 or as weather permits. All work must be completed no later than May 1, 2021.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents