Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Parking Lot Resurfacing Project
Infrastructure
Results
Robertsdale, AL

North Drive (Rock Creek) Roadway Improvement Project
Infrastructure
Results
Fairhope, AL 36532

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Kinderkids Daycare
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Harbor Club Condominiums / Orange Beach
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Orange Beach, AL 36561

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

Water System Improvements
Infrastructure
Results
Summerdale, AL

Last Updated 08/17/2023 12:26 PM
Project Title

City of Foley Sidewalk Extension

Physical Address View project details and contacts
City, State (County) Foley, AL 36535   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CITY OF FOLEY SIDEWALK EXTENSION (KENNY STABLER AVE/BLVD & KONIAR WAY) This project consists of: 2,430 SY of Concrete Sidewalk; 726 LF of Concrete Storm Drain; 5 Drainage Structures. A total of Sixty (60) working days will be allowed for completion of work. All Bidders must file with their bids either a cashier's check drawn on an Alabama bank or a bid bond executed by a surety company duly authorized and qualified to make bonds in the State of Alabama and made payable to the City of Foley in the amount of five (5%) percent of the Contractor's bid but in no event more than $10,000 and shall have a current State of Alabama General Contractors License. Furthermore, any Contractor that desires to bid as prime Contractor must have at least one of the following major classifications of license per Section 230-X-.27 of the State of Alabama Licensing Board for General Contractors Administrative Code: a) Highways and Streets b) Municipal and Utility c) Heavy and Rail Construction If awarded the bid and prior to beginning work, the Contractor is required to have a current City of Foley Business License, furnish a Certificate of General Liability Insurance and Workers Compensation Insurance, and proof of Automobile General Liability Insurance. Insurance Certificate provided to the City shall list the City of Foley as an additional insured. A performance bond and Payment Bond must be executed upon award of the bid with a penalty equal to one hundred (100%) percent of the amount of the contract price. The City of Foley reserves the right to accept or reject any or all bids and to waive technical errors if, in the City's judgment, the best interests of the City will thereby be promoted. All requests for information/clarification regarding this project shall be submitted in writing to the engineer either by email to sdelahunty@sawgrassllc-com or phone call to 251-544-7900 to the Spanish Fort Office. Absolutely no telephone calls will be accepted and no questions will be answered 24 hours prior to bid opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents