Similar Projects
Last Updated | 04/12/2023 03:03 PM |
Project Title | Long Line Pavement Markings, Statewide |
Physical Address | View project details and contacts |
City, State (County) | Middletown, DE 19709 (New Castle County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $12,597,668 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This item shall govern the Quality Assurance Testing for supplying bituminous asphalt plant materials and constructing bituminous asphalt pavements and the calculation for incentives and disincentives for materials and construction. The Engineer will evaluate all materials and construction for acceptance. The procedures for acceptance are described in this Section. Include the costs for all materials, labor, equipment, tools, and incidentals necessary to meet the requirements of this specification in the bid price per ton for the bituminous asphalt. Payment to the Contractor for the bituminous asphalt item(s) will be based on the Contract price per ton and the pay adjustments described in this specification. The improvements consist of furnishing all labor and materials for work to include curb and gutter, sidewalk repairs, and/or Bituminous Concrete milling and overlay. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. LOCATION: Statewide. The specific work sites are not listed herein but will be assigned COMPLETION TIME: All work on this contract must be complete within 1,095 Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. The contract may be renewed for two (2) additional, one-year extension periods through negotiation between the Vendor and the Department. Negotiation should be initiated no later than ninety (90) days prior to contract termination. The State reserves the right to extend this contract on a month-to-month basis for a period of up to three months. It is estimated a Notice to Proceed is issued such that work starts on or about April 3, 2023. QUESTIONS: E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. DelDot - Long Line Pavement Markings, Statewide |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |