Similar Projects
Bayles Lake HOA Hydropneumatic Storage Tank and Treatment Building
New Construction, Renovation, Alteration
Post-Bid
$400,000 est. value
Loda, IL

Roadway Widening
Infrastructure
Post-Bid
Sheldon, IL

Replace the Bridge Carrying Ch 4 Over Pike Creek, 3.3 Miles West of Il Rt 1
New Construction
Results
IL

Seal Coat
Infrastructure
Results
Crescent City, IL

Road Repair
Infrastructure
Post-Bid
Watseka, IL

Bituminous Materials
Infrastructure
Results
Clifton, IL

Intersection of IL 49 and IL 24 (l.m. 0.00) and Ending at the Vermilion County Line (L.M. 21.50)
Infrastructure
Post-Bid
IL

Pavement Patching Pavement Striping and Other Related Construction Items
Infrastructure
Results
IL

Route 317 (US 24) Beginning at the Intersection of US 45/24(L.M. 0.00) in Gilman and Ending at the Intersection of US 24 and IL 1 (L.M. 12.34)
Infrastructure
Post-Bid
IL

7.15 Miles of Crack Routing and Crack Sealing
Infrastructure
Results

Route 57 (I-57) Beginning at the Ford County Line and Ending Approximately 4.5 Miles North of US 24 (Gilman)
Infrastructure
Post-Bid
IL

A-1 Seal Coat
Infrastructure
Results
Buckley, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Class B Pavement Patching and Related Construction Work
Infrastructure
Post-Bid
$2,000,000 est. value
Watseka, IL 60970

Last Updated 12/19/2022 05:08 PM
Project Title

Furn to Jobsite - PCBC, Concrete End Section

Physical Address View project details and contacts
City, State (County) Wellington, IL 60973   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $134,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City/County Iroquois Description: Furn to Jobsite 46.5 Lin Foot Pcbc (18' Span X 5' Rise) Astm C1577 (0-2 Ft Cover) 2 Ea Precast Concrete End Section (18' Span X 5' Rise X 6' Long) Astm C1577 (0-2 Ft Cover) 44 Lin Ft Pcbc (8' Span X 4' Rise) Atsm C1577 (0-2 Ft Cover) 2 Ea Precast Concrete End Section (8' Span X 4' Rise X 6' Long) Astm C1577 (0-2 Ft Cover) No Proposals Will Be Issued After 4:00 on 12/7/2022 for the Aforementioned Road Districts. Project Location: 1 1/2 Miles South of Wellington, Il Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Furn to Jobsite - PCBC, Concrete End Section - 22-15112-00-DR

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents