Last Updated 01/08/2020 08:44 AM
Project Title

Annual Contract for Small Pressure - Flow Pipe Work

Physical Address View project details and contacts
City, State (County) Morrow, GA   (Clayton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $161,403
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Clayton County Water Authority (CCWA) intends to contract with up to two (2) experienced Contractors to complete work on pressurized pipe systems up to 8 inches in diameter. CCWA is implementing a 10-year strategic master plan that has a large focus on replacement and renewal of our water and sewer pipelines. A substantial portion of the nearly $14 million per year of planned work on these projects are executed through our annual service pipe contracts, including this contract. Annual Contract for Small Pressure-Flow Pipe Work were paid approximately $1.42 million and $1.24 million, respectively. CCWA anticipates the annual value of work to be completed through this contract will be in the range of $1.25 to $1.75 million dollars.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents