Last Updated 03/31/2020 09:43 AM
Project Title

Marquardt Building - Second Floor HVAC Repairs

Physical Address View project details and contacts
City, State (County) Augusta, ME 04333   (Kennebec County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work encompasses mechanical system renovations to the second floor of the Marquardt Building. Work consists of selective demolition work of the existing second floor mechanical system as well as the removal and salvage of the existing suspended acoustical ceiling panels and light fixtures for reinstallation. New work includes provision of a steam to water heat exchanger within the first floor mechanical room, second floor HVAC system replacement, rooftop mechanical units, mechanical chases, provision of a suspended acoustical ceiling grid system and the reinstallation of the salvaged acoustical ceiling panels and lighting fixtures as well as associated architectural and electrical work required in support of the HVAC system repairs and replacement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents