Similar Projects
Crab Orchard NWR-IDIQ Road & Associated Infrastructure Maintenance
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Marion, IL 62959

Saline River Farms Meat Processing Plant
New Construction, Infrastructure - 83,000 SF
Design
$40,000,000 CJ est. value
Creal Springs, IL 62922

Dunkin' / Marion
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Marion, IL 62959

Boyton Street Addition
Addition, Demolition, Infrastructure - 5,000 SF
Bidding
$310,000 CJ est. value
Marion, IL 62959

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Construct Pedestrian Walkway, Improve Drainage and Relocate Bell Tower (General)
Infrastructure
Results
Less than $800,000 est. value
Carterville, IL 62918

Calcium Chloride Solution
Alteration
Results
Amboy, Harmon, Marion, Reynolds, Sublette, IL

Illinois 37 Improvements - Illinois Department of Transportation
Infrastructure
Design
$1,200,000 CJ est. value
Marion, IL 62959

Hall Street Pump Station
Infrastructure
Bidding
$2,000,000 CJ est. value
Cambria, IL 62918

Overlay The Existing OC Streets, Various Surface Removal, and Provide Traffic Control
Infrastructure
Post-Bid
$400,000 est. value
Pittsburg, IL

Pavement Patching on IL 166
Infrastructure
Results
$2,000,000 est. value
Creal Springs, IL 62922

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

HMA Surface Removal, Resurfacing and Patching on Old IL13
Infrastructure
Results
$2,000,000 est. value
Marion, IL 62959

Crab Orchard NWR-IDIQ Road and Associated Infrastructure Maintenance
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Marion, IL 62959

Last Updated 08/11/2023 10:09 AM
Project Title

Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,086,491 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge. Region 5 District 9 Federal Project # N/a County(S) Williamson Key Route(S) Crab Orchard Greenway Trail Marked Route(S) Section(S) 21-00163-00-bt State Job #(S) C-99-012-22 Pps #(S) 0-00913-9009 9-10711-0000 160 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 204 - Construction of a Concrete Multi-use Trail

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents