Similar Projects
Project Aspen Roadway Improvements
Infrastructure
Bidding
Rock Hill, SC 29732

On Call Paving-York County
Infrastructure
Bidding
York, SC

Reconstruction/Rehabilitation - District 4
Post-Bid

Pavement Replacement Project
Infrastructure
Post-Bid
Fort Mill, SC 29715

Rehabilitation - York County
Results
SC

Pennies for Progress Road S-424 (Bate Harvey Road) Road Rehabilitation Project
Results
York, SC 29745

Genthe Court Extension
New Construction
Post-Bid
SC

Tega Cay 2020 C-Fund Project
Results
$100,000 to $160,000 est. value
Tega Cay, SC

2020 Road Rehabilitation Project
Results
Less than $150,000 est. value
Clover, SC 29710

Interstate 77 Panther Interchange Project
Results
SC

Reconstruction/Rehabilitation - District 4
Results

Pavement Rejuvenator
Results
Rock Hill, SC 29730

Rehabilitation/Reconstruction - York County
Results
SC

Dist 4 On-Call Lane Closure
Term Contract
Results

Preservation - District 4
Results

Last Updated 09/15/2021 08:44 AM
Project Title

Reconstruction/Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Selected Clearing & Grubbing 1.000 Ls Removal & Disposal of Existing Concrete 7.500 Cy Unclassified Excavation 973.000 Cy Borrow Excavation 2,373.000 Cy Station Grading 131.460 Sta Cement Modified Recycled Base (10" Unif)-curing Method B 137,505.000 Sy Portland Cement for Cement Modified Recycled Base Course 4,884.000 Ton Maintenance Stone 419.000 Ton Liquid Asphalt Binder Pg64-22 1,922.052 Ton Full Depth Asph. Pav. Patching 8" Unif 60.000 Sy Full Depth Asph. Pav. Patching 10"Unif 420.000 Sy Full Depth Asph. Pav. Patching 12"Unif 2,750.000 Sy Milling Existing Asphalt Pavement 1.5" 1,550.000 Sy Milling Existing Asphalt Pavement 2.0" 1,400.000 Sy Milling Existing Asphalt Pavement (Variable) 14,850.000 Sy Milled-in Rumble Strip 24.860 Mi Hot Mix Asphalt Intermediate Course Type C 13,074.688 Ton Hot Mix Asphalt Surface Course Type C 16,008.118 Ton Hot Mix Asphalt Surface Course Type E 1,610.752 Ton Driveway Paving-surface Type C 2,877.075 Ton Asphalt Surface Treatment(Single Treatment) 137,505.000 Sy Permanent Construction Signs (Ground Mounted) 2,291.000 Sf Pavement Markings (Temporary Paint) 24"X36" White Triangle Yieldbar144.000 Lf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 1,165.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 483,055.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 128.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 1,855.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 4.000 Ea White Word Message "Only"-fast Dry Paint 3.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 6,025.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 449,303.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 500.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 885.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 140,223.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 64.000 Lf 24in X 36in White Triang. Yield Bar (Gaps Exc)thermo-125mil 72.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 836.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 3.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 6,025.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 108,965.000 Lf Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 926.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 100.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 3,210.000 Lf Sawcut for Loop Detector 1,275.000 Lf F&i-12"X12"X12"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 1.000 Ea F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 1.000 Ea Temporary Adjustment of Traffic Signal Equipment 3.000 Ea 15" Smooth Wall Pipe 16.000 Lf 18" Smooth Wall Pipe 465.000 Lf 24" Smooth Wall Pipe 16.000 Lf Cleaning Existing Pipe 450.000 Lf Concrete Collar for Up to 24" Pipe 30.000 Ea Rip-rap (Class a) 210.000 Ton Rip-rap (Class B) 85.000 Ton Geotextile Fabric for Erosion Control Under Riprap (Class 2) 300.000 Sy Remove & Dispose Semi-rigid Gr Device 2,060.000 Lf Mt3 Leading End Treatment Tl3 4.000 Ea Mgs3 Gr Standard Shoulder 775.000 Lf Premash Type T Tl2 Leading 25ft 1.000 Ea Premash Type T Tl3 Leading 50' 22.000 Ea Barbed Wire Fence - 4 Strands 1,800.000 Lf Reset Fence 2,900.000 Lf Permanent Grassing for Non-permitted Resurfacing Projects 9.220 Acre Silt Fence 6,400.000 Lf Replace/repair Silt Fence 1,950.000 Lf Cleaning Silt Basins 30.000 Cy Removal of Silt Retained by Silt Fence 2,450.000 Lf Aggregate No.5 or 57 for Erosion Control 60.000 Ton

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents