Similar Projects
Last Updated | 02/09/2022 04:19 PM |
Project Title | 2022 Haskell Street Reconstruction (West Street to Madison Street) |
Physical Address | View project details and contacts |
City, State (County) | Beaver Dam, WI 53916 (Dodge County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 730 LF of sanitary sewer replacement (10" thru 21") and laterals along with associated sanitary sewer work; 760 LF of water main replacement (6" thru 8") and services; 790 LF of storm sewer replacement (12" thru 15" and 23"x14") and associated storm structure work; 3,100 SY aggregate base and geogrid installation; 1,500 SY topsoil and sodding; 80 TON of asphalt pavement; 2,250 SY of concrete pavement; 7,700 SF of concrete sidewalk; 1,500 LF concrete curb and gutter; 3,700 SF concrete driveway; 1,200 SF segmental retaining wall; as well as all related work including unclassified excavation, erosion control, traffic control. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |