Similar Projects
IDIQ MATOC
New Construction
Design
Kansas City, KS

Outpatient Mental Health Addition
Addition, Demolition, Renovation, Infrastructure
Design
$20,000,000 CJ est. value
Topeka, KS 66622

RFQ Contractor - Correct Seismic Deficiencies Building 41 Leavenworth, Kansas Construction
Renovation
Bidding
$5,000,000 CJ est. value
Leavenworth, KS 66048

Pedestal
Renovation
Bidding
$1,000,000 CJ est. value
Fort Riley, KS 66442

Ft Riley Barracks 7081 A, B, E, F Renovation
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Wolf Creek, KS 67481

Building 670 Construction Addition
Addition, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
KS

Building #77 Remodel Latrines & Add Room
Renovation
Results
Fort Leavenworth, KS

Adjutant General's Department - Hiawatha Readiness Center Sustainment Repairs
Renovation
Results
$424,858 CJ est. value
Hiawatha, KS 66434

Fort Riley - Multiple Buildings
Renovation
Construction
$1,000,000 CJ est. value
Fort Riley, KS 66442

Building 196 HVAC Construction - Fort Leavenworth, Kansas
Renovation
Design
$5,000,000 CJ est. value
Wolf Creek, KS 67481

Adjutant General's Department Hutchinson Readiness Center Sustainment Repairs
Renovation
Bidding
$864,800 CJ est. value
Hutchinson, KS 67501

Repair Bldg 412 HVAC Phase 2
Build-out, Renovation
Post-Bid
$5,000,000 CJ est. value
McConnell AFB, KS 67221

F--Caney Superfund Site Remedial Action
Term Contract
Design
Caney, KS 67333

Add Offices to Building 65 for FSS, MSG and Wing HQ
Renovation
Post-Bid
$500,000 CJ est. value
McConnell AFB, KS 67221

Repair Liquid Nitrogen (LN2) Leak Damage
Renovation
Design
$1,000,000 CJ est. value
Manhattan, KS 66502

Last Updated 06/30/2023 11:05 AM
Project Title

RFQ Contractor- Replace Gas Line 184 Wing Kansas Air National Guard

Physical Address View project details and contacts
City, State (County) McConnell AFB, KS 67221   (Sedgwick County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Category: Y1NZ - Construction of Other Utilities -- Potential Sources Sought Date Published: 22 June, 2023 Contact: 184th Wing, Kansas Air National Guard Contracting Office, 52955 Jayhawk Dr, Bldg. 65, McConnell AFB, Ks, POC Darin.brun@us.af.mil Synopsis: Replace Approximately 4720 Liner Feet of Gas Lines 184 Kansas Air Guard Base - SOURCES SOUGHT. The purpose of this synopsis is to gain knowledge of potential sources for this project including interested Small Business sources. This notice is for planning purposes only. All interested parties should respond. 184 Wing Air National Guard Base, Kansas intends to issue a solicitation and award of a contract to "Replace Approximately 4720 Liner Feet of Gas Lines". This is an unfunded requirement, and any following solicitation will identify this is an unfunded requirement. No contract award will be made until appropriated funds are made available. The magnitude of this project is between $500,000.00 and $1,000,000.00. All interested concerns will provide this office, in writing, a notice stating their positive intent to submit a proposal as a prime contractor no later than 06 July 2023. This notification, which shall not exceed five type written pages, must include (1) positive statement of intent to bid as a prime contractor, and (2) a completed and signed Source Sought Information Request Form and (3) A listing of projects completed during the past three years, both for government and private industry. The type of project, dollar value, Contract number, location, and Point of Contact are to be included. Indicate if you were prime or subcontractor, and if subcontractor, provide the name and point of contact for the prime contractor. (4) A brief outline of resources, subcontractors, and key personnel that would be used to accomplish the contract. In the event adequate Small Business contractors are not available for adequate competition for this project, it may be advertised as unrestricted. Information shall be provided via email to: Darin.brun@us.af.mil . Include the following in the subject line "Sources Sought W50S7X-23-B-0003". No facsimile responses will be honored. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents