Similar Projects
Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 est. value
Tulsa, OK 74127

US-64 and US-169 - Interchange
Infrastructure
Design
$7,445,109 est. value
Bixby, OK 74008

2022 Street Rehabilitation Program
Infrastructure
Bidding
$400,000 est. value
Owasso, OK

2022 Street Rehabilitation Program
Infrastructure
Bidding
$400,000 est. value
Owasso, OK

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Construction of River West Festival Park Sidewalk Addition
Infrastructure
Bidding
$2,000,000 est. value
Tulsa, OK 74107

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

Reported 07/20/2022 12:00 AM
Project Title

Yuma Drive Saddleback Addition Street Repair And Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes pavement repair and stormwater improvements on Yuma Dr. north of the intersection with E. Baton Rouge St. in the Saddleback Addition. The stormwater improvements include installation of 140 feet of perforated under drain and 103 feet of non-perforated under drain installed beneath approximately 280 square yards of full depth asphalt pavement repairs. The project also includes construction of approximately; 30 feet of 5' wide sidewalk; 50 feet of curb and gutter; 72 square yards of residential concrete driveway; ancillary pavement cold milling. Contract time for the project shall be Forty Five (45) calendar days. This project is located on E. Yuma Dr. north of the intersection with E. Baton Rouge St. in the Saddle back addition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents