Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Air Compressor and Installation
Renovation
Sub-Bidding
$650,000 CJ est. value
Bay City, MI 48708

Valley View/ Coburn Boiler Replacement Project
Renovation
Sub-Bidding
$250,000 CJ est. value
Battle Creek, MI 49017

Horizontal Unit Ventilator
Alteration
Post-Bid
Clio, MI 48420

Clio High School Area F Air Conditioning Renovation
Alteration
Post-Bid
Clio, MI

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

HVAC Renovations - Air Conditioning
Alteration
Results
Alma, MI 48801

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

JBB Marquette Branch Prison - Kitchen Cooler - Freezer
Renovation
Sub-Bidding
$125,000 CJ est. value
Marquette, MI 49855

High School Boiler Replacement BP 2
Alteration
Post-Bid
Clinton, MI

IT Room HVAC Upgrades
Alteration
Results
Warren, MI 48089

HVAC for Bus Wash Project
Alteration
Post-Bid
Clinton, MI

Air Filters
Alteration
Results
Sterling Heights, MI

Fire Station Duct Cleanings
Alteration
Post-Bid
Clinton Township, MI 48038

2022 Ventilation Equipment Package
Alteration
Results
Warren, MI 48089

Last Updated 09/05/2023 05:31 AM
Project Title

Chiller Replacement - Administration Building

Physical Address View project details and contacts
City, State (County) Port Huron, MI 48060   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000325984 The County of St. Clair is accepting bids for the Chiller Replacement at the St. Clair County Administration Office located at 200 Grand River Avenue, Port Huron, Michigan. Question Acceptance Deadline 08/14/2023 03:00 PM EDT Questions are submitted online No - Please direct all questions or inquiries relative to contractor insurance requirements to: Lori Parent, Risk Management Coordinator County of St. Clair 200 Grand River Ave., Ste. 203 Port Huron, MI 48060 Phone: (810) 989-6313 Fax: (810) 985-3463 Email: lparent@stclaircounty.org The County reserves the right to postpone the bid opening for its own convenience. Verify chiller unit to be removed is isolated from Chiller 2 unit Disassembly of approximately 28 feet of metal existing enclosure to facilitate removal of existing unit. The enclosure to be maintained for later installation Shut down the unit Drain unit if required Removal and disposal of refrigerant per EPA regulations Disconnect and repair of existing piping to ensure proper installation and operation of new chiller Provide crane to remove existing chiller Provide crane to install new chiller Identify expected lead times on equipment and components with bids Set new chiller on pad all pad modifications, if needed, are the responsibility of the contractor Provide and install 1 new Square D Safety Switch: Fusible, 600 Amp, Three Phase, 600VAC Galvanized Steel Indoor/Outdoor Provide and install a replacement 300-ton cooling capacity chiller that is compatible with current HVAC components and systems Connect and insulate the new water piping, where required, to the new chiller Install new electrical run-in conduit with all necessary electrical components for the Safety Switch and any other electrical required equipment on the new chiller Flush and leak check piping Provide chemical treatment (chemicals only) for 1 season of operation. Startup chiller and verify operation Ensure proper operation/integration with current Honeywell building management system Reinstall metal enclosure Provide labor and material and rigging for the above of work The contractor shall be responsible for all permits and their associated costs The contractor shall be responsible for the disposal of the existing chiller Dumpsters and garbage removal for the project are the responsibility of the contractor The Owner / Occupant will not clean up behind Contractor. Contractor is responsible for cleanup of debris caused by their construction activities or negligence

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents