Similar Projects
Resurfacing Various Routes Within The City of Watseka
Infrastructure
Bidding
$500,000 CJ est. value
Watseka, IL 60970

Resurfacing Various Routes Within The City of Watseka
Infrastructure
Bidding
$500,000 CJ est. value
Watseka, IL 60970

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bayles Lake HOA Hydropneumatic Storage Tank and Treatment Building
New Construction, Renovation, Alteration
Post-Bid
$400,000 est. value
Loda, IL

Road Improvements
Infrastructure
Results
$98,986 est. value
Onarga, IL

Road Improvements
Infrastructure
Results
$98,986 est. value
Onarga, IL

Roadway Widening
Infrastructure
Post-Bid
Sheldon, IL

East of Sugar Creek on US 24 and Goes East 3.08 Miles including a 3P Milling and Resurfacing of US 24 Including Drainage and ADA Improvements
Infrastructure
Results
IL

Road Repair
Infrastructure
Post-Bid
Watseka, IL

Milling and Resurfacing I-57 Interstate and Buckley Interchange Ramps
Infrastructure
Results
IL

Intersection of IL 49 and IL 24 (l.m. 0.00) and Ending at the Vermilion County Line (L.M. 21.50)
Infrastructure
Post-Bid
IL

Roadway Reconstruction, Curb and Gutter, Storm Sewers, Landscaping, Streetscape, Lighting, and Pavement Markings on North Central Street, from Crescent St. to East 3rd Street, and on East 2nd Street
Infrastructure
Results
Gilman, IL

Route 317 (US 24) Beginning at the Intersection of US 45/24(L.M. 0.00) in Gilman and Ending at the Intersection of US 24 and IL 1 (L.M. 12.34)
Infrastructure
Post-Bid
IL

HMA Milling and Resurfacing, Shoulder Work, ADA Ramps, Pavement Marking, and Raised Reflective Markers
Infrastructure
Results
IL

Route 57 (I-57) Beginning at the Ford County Line and Ending Approximately 4.5 Miles North of US 24 (Gilman)
Infrastructure
Post-Bid
IL

Last Updated 06/08/2023 09:12 AM
Project Title

Class B Pavement Patching and Related Construction Work

Physical Address View project details and contacts
City, State (County) Onarga, IL 60955   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $324,616 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work. Region 2 District 3 Federal Project #N/A County(s) Iroquois Key Route(s) FAP 840 Marked Route(s) IL 49 Section(s) (136,135,123)PP State Job #(s) C-93-067-22 PPS #(s) 0-02176-3015 Small Business Initiative (Bid Bond is not required) Completion Date : 15 Working Days Questions not accepted as of April 19, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 111 - Class B Pavement Patching and Related Construction Work

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents