Similar Projects
Last Updated | 12/03/2020 12:58 PM |
Project Title | Newman Substation Civil Site Construction |
Physical Address | View project details and contacts |
City, State (County) | Garland, TX 75040 (Dallas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All necessary surveying, temporary fencing, demolition, clearing and grubbing, excavation, earthwork, removal of spoils, removal of foundations, removal of fencing, foundations, grounding, drainage systems, subgrade preparation, flexible base subgrade, perimeter fencing, gates, testing, trench safety, temporary excavation shoring, backfilling, vegetative stabilization, erosion control measures during construction, and all other work required. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |