Similar Projects
Last Updated | 07/01/2022 02:42 AM |
Project Title | General Contractor/Construction Manager (GC/CM) - 2022 Levy Middle School Additions |
Physical Address | View project details and contacts |
City, State (County) | Redmond, WA (King County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide high quality pre-construction consulting services including accurate cost estimating, efficiency/effectiveness ideas that result in cost savings in the design and construction process and also the operation of the final product, detailed scheduling, constructability, phasing, logistics, collaboration with the design consultants, and assistance in the selection of materials and building systems. Provide integrated use of current design and construction technology including Building Information Modeling and Virtual Design and Construction to help maximize construction efficiency, limit waste, and avoid re-work. Integrate with LWSD document and workflow management systems, including web-based collaboration tools to streamline typical project workflows and document controls. Assist LWSD in establishing and achieving high performance design and construction goals including the delivery of efficient and effective facilities. |
||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Addition.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |