Similar Projects
Wellfield and System Improvements
Addition, New Construction, Renovation, Infrastructure
Design
$21,038,500 CJ est. value
Columbus, IN 47201

BL149 Sycamore Hall - Sycamore Hall N Restroom, 4th Floor Piping & Morrison Hall Plumbing
Renovation
Bidding
$1,436,000 CJ est. value
Bloomington, IN 47405

Wastewater Treatment Plant Improvements Project
Addition, Demolition, Infrastructure, Renovation
Bidding
$2,500,000 CJ est. value
Ligonier, IN 46767

Turkey Creek South Lift Improvement and Sanitary Sewer Improvement Project
Renovation
Post-Bid
Merrillville, IN

Southeast Sanitary Sewer Improvements Phase 3 -Lift Station and Force Main Replacement Project
Renovation, Infrastructure
Post-Bid
Columbus, IN

Spurgeon Lift Station and Force Main
New Construction, Infrastructure
Results
Lynnville, IN 47619

Wastewater System Improvements Lift Stations No. 1, No. 3, and No. 4 Improvements
Renovation
Results
Santa Claus, IN

Wastewater Improvements Project Division II Plant and Lift Station Improvements
Renovation
Construction
$1,558,667 CJ est. value
Albion, IN 46701

Wastewater Treatment Plant Final Clarifier, Solar, and Screen Improvements Project
Renovation, Infrastructure
Bidding
$926,000 CJ est. value
Portage, IN 46368

Gibson Street Regional Lift Station
New Construction
Post-Bid
$500,000 est. value
Winfield, IN 46307

Wansford Yard Lift Station project - Phase 1 - Division A
New Construction, Infrastructure
Results
$22,863,700 CJ est. value
Evansville, IN 47708

Total Concepts Pump Station And Forcemain Installation Project
Infrastructure
Bidding
$650,000 CJ est. value
Scottsburg, IN 47170

West Terre Haute Wastwater Treatment Facility Improvements
Renovation
Post-Bid
$200,000 CJ est. value
Terre Haute, IN 47807

Main Street Regional Lift Station Contract A
New Construction
Results
$4,750,000 est. value
Whitestown, IN

Water Utility Improvements Project Phase 4
Infrastructure, Renovation
Bidding
$640,000 CJ est. value
Crown Point, IN 46307

Last Updated 10/05/2023 07:35 AM
Project Title

High Service Pump Improvements

Physical Address View project details and contacts
City, State (County) East Chicago, IN 46312   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $687,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Direct questions to Mr. John P. Caruso, PE of Christopher B. Burke Engineering, Ltd. at (847) 823-0500. No bid shall be withdrawn after the opening of the proposals without the consent of Board of Directors of the East Chicago Department of Waterworks for a period of forty-five days after the scheduled time of closing bids. This project generally consists of providing all materials, equipment and services necessary for the construction, installation and testing of a new 400 Hp VFD, new cable and conduit, new differential pressure switch, pressure tap, pressure gauge and copper piping. The Operations Building is located at 3455 Pennsylvania Avenue. All proposals shall be sealed in an envelope, addressed to the City of East Chicago, IN, attention: Winna Guzman, Director. The name, address and phone number of the bidder and the name of the project shall also appear on the outside of the envelope. Proposals must be submitted on the forms provided by the Engineer. Contractors must purchase bid documents and be shown on the Bidder's Plan Holder List in order to bid. Bids received from contractors who are not in the Bidder's Plan Holder List will be rejected. A certified check/bank draft drawn on a solvent bank, payable without condition to the East Chicago Department of Waterworks, orabid bond in an amount not less than ten percent (10%) of the bid shall be submitted with each proposal as a guarantee that, if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. A Performance Bond and Payment Bond, each in a sum equal to one hundred percent (100%) of the amount of the bid with sureties to be approved by the East Chicago Department of Waterworks, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish bonds upon acceptance of such bid or proposal. Contractors and Subcontractors shall conform to the requirements for public works, I.C. 36-1-12 and I.C. 5-16-1. Contractors shall be required to pay not less than the prevailing wage rates on the Project as established by the United States Department of Labor and the State of Indiana Department of Labor. Copies of these wage rates are incorporated in the Contract Documents. Bids will only be received from qualified contractors. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the East Chicago Department of Waterworks their best interests will be promoted thereby.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents