Similar Projects
Spring Hill Industrial Buildings 2 & 3
New Construction - 231,999 SF
Design
Spring Hill, TN

Solid Waste Landfill Metal Building Construction
New Construction
Bidding
Sparta, TN 38583

Construction of Equipment Sheds
New Construction
Bidding
Baxter, TN

Last Mile Distribuition Warehouse - DNA2
New Construction, Demolition - 455,378 SF
Post-Bid
$10,000,000 CJ est. value
Nashville, TN 37204

Home Star Self Storage - Shell
New Construction - 41,944 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Memphis, TN 38122

Pole Barn at "Boneyard" for MBWWTP
Results
Less than $192,500 est. value
Chattanooga, TN 37405

Greenway Farms New Conference Facility
Results
Less than $1,727,600 est. value
Chattanooga, TN 37402

Woods Air Movement to Establish North American Headquarters
New Construction - 25,000 SF
Construction
Less than $3,600,000 est. value
Murfreesboro, TN

Delivery Station Bna8
Build-Out - 278,670 SF
Construction
Lebanon, TN 37087

Amazon Fulfillment Center
New Construction - 635,000 SF
Pending Verification
$200,000,000 est. value
Alcoa, TN 37701

Amazon Warehouse
New Construction
Pending Verification
$39,894,098 est. value
Nashville, TN 37204

30 X 40 Clear Span Building
New Construction - 1,200 SF
Bidding
Mc Ewen, TN

Pole Barn - 40' X 84' Building
Post-Bid
Dunlap, TN 37327

Portable Storage Buildings
Results
TN

United Rentals
Renovation - 3,900 SF
Construction
Nashville, TN 37213

Last Updated 11/02/2021 03:00 PM
Project Title

Farmers Market - Building Erection

Physical Address View project details and contacts
City, State (County) Manchester, TN 37355   (Coffee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is part of a larger, on-going, multi-phase project. The work provided under this contract includes, but is not necessarily limited to: the erection of a pre-engineered metal building and the drying-in of the building shell. The building shall be erected on the existing concrete slab that was provided in a previous phase. The materials for the pre-engineered metal building were purchased under a separate contract, referred to as the metal building package

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents