Similar Projects
Live Oak Dr Sidewalk Improvements
Post-Bid
Jacksonville, FL 32246

Brentwood Park, Installation of ADA Compliant Concrete Path
Post-Bid
Jacksonville, FL 32206

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

Love Bridal Boutique
Renovation - 3,760 SF
Construction
$396,000 est. value
Jacksonville Beach, FL

Spring Dog Park Sidewalk, Swale and Fence Project
Infrastructure
Post-Bid
Jacksonville, FL 32206

Lenox Avenue Sidewalk Improvments - JSEB Set Aside
Results
Less than $289,981 est. value
Jacksonville, FL 32202

Multiple ADA Curb Ramp Improvements Design-Build Projects
Infrastructure
Post-Bid
Less than $8,000,000 est. value
Jacksonville, FL

Biscayne Boulevard Sidewalk from Biscayne CT to International Airport Boulevard-PQ-Horizontal
Results
Jacksonville, FL 32202

Braddock Road Sidewalk Improvements-PQ-Horizontal
Results
Less than $591,066 est. value
Jacksonville, FL 32219

Sibbald Road Sidewalk Improvements
Results
Less than $553,711 est. value
Jacksonville, FL

Concrete Maintenance and Construction (North Area)
Results
$500,000 to $1,000,000 est. value
Jacksonville, FL

Citywide Pedestrian Safety Improvement Program
Results
Less than $750,000 est. value
Jacksonville, FL 32202

Solid Waste Admin Building - Motor Vehicle Inspection Station - Brentwood Golf Course - Southside Tennis Center ADA Improvements - Package E
Results
Less than $119,614 est. value
Jacksonville, FL 32209

Cisco Garden Parking
Results
Less than $84,615 est. value
Jacksonville, FL 32219

Last Updated 11/24/2021 08:25 AM
Project Title

Sunny Acres Park - Parking Lot

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32225   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, equipment, and performing all operations necessary for construction of selectively demolish and rebuild the parking lot, walkways, and stormwater facilities for the area near the building at Sunny Acres Park to ensure proper drainage, a dry building and ADA compliant parking and walkways.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents