Similar Projects
Loch Raven Watershed Ford Crossing (LR-2.LR-8-LR-11, LR-12)
Bidding
$500,000 to $1,000,000 est. value
Baltimore, MD

Providing Roadside and Drainage Maintenance for the Administration's Maintenance Shops Located in Anne Arundel County
Post-Bid
$1,000,000 to $2,500,000 est. value
MD

Pre-Cast Reinforced Concrete Box Culverts, Fair Hill NRMA
Post-Bid
Less than $50,000 est. value
Annapolis, MD 21401

Construction Services Dorsey Avenue Drainage Improvements
Results
$502,697 est. value
Annapolis, MD 21401

Construction of the Eisenhower Golf Course Stream Restoration
Results
Crownsville, MD

Turkey Point Shoreline Management
Pending Verification
Edgewater, MD 21037

Interstate 295 Miscellaneous Roadway Improvements
Post-Bid
$3,900,000 est. value
Wilmington, DE 19801

Long Term Lot a Culvert Replacement
Results
$1,522,640 est. value
Glen Burnie, MD 21061

On-Call Drainage and Stormwater Remediation
Results
$5,000,001 to $10,000,000 est. value
Baltimore, MD

Watershed Restoration Construction Stormwater Best Management Practices Task Order Contract
Results
$3,000,000 est. value
Annapolis, MD 21401

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

St. Mary's River Sanctuary Restoration Enhancement Project
Results
Annapolis, MD 21401

Stream and Wetland Restoration Maintenance Services at Baltimore/Washington International Thurgood Marshall Airport
Term Contract
Results
Less than $200,000 est. value
Glen Burnie, MD 21061

Watershed Reconstruction Construction Stream Restoration Area A Task Order
Results
$3,000,000 est. value
Annapolis, MD 21401

Cox Creek DMCF +60 Dike Raising and Expansion
Results
MD 21226

Last Updated 10/19/2020 12:21 PM
Project Title

SMRR Rock Creek Row MH 16920

Physical Address View project details and contacts
City, State (County) MD   (Anne Arundel County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: Installation of Class 0 and Class 1 rip rap, matting, bypass pumping, and vegetation for the purposes of reconstructing and protecting the stream bank and sanitary sewer infrastructure. The work also includes improvements to existing access path to the work site and erosion and sediment control devices.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents