Similar Projects
War Memorial Field Boat Launch Phase 2 - Floating Motorized Launch Facility
Alteration
Results
$450,000 est. value
Sandpoint, ID

Lakeview Cabin Foundation Replacement
Demolition, Infrastructure
Post-Bid
$60,000 est. value
Plummer, ID 83851

Reported 03/10/2022 11:01 AM
Project Title

Marina Mooring Dock Replacement

Physical Address View project details and contacts
City, State (County) Lewiston, ID 83501   (Nez Perce County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method
Project Status Construction Commenced second quarter 2022
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project can be summarized to include the labor and materials required to remove and dispose of the existing concrete docks, manufacture, and install new docks and gangway ramps and piles, install electrical and water connections, and install an access gate.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents