Last Updated | 08/05/2023 10:33 PM |
Project Title | Sports Complex Synthetic Turf |
Physical Address | View project details and contacts |
City, State (County) | Pewaukee, WI 53072 (Waukesha County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Landscaping, Landscaping/Irrigation |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,582,092 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximate quantities are as follows: Grading & Excavation 1 LS (2.66-acre site) \ Remove Underdrain 4,336 LF \ Remove Irrigation Lines 2,817 LF \ Remove Granular Warning Track Material 7,510 SF \ Remove Foul Poles 2 EA \ Remove Chain Link Fence Gates 4 EA \ Remove Chain Link Fence and Posts 1,464 LF \ Sediment Logs 16 EA \ Inlet Protection 6 EA \ Storm Manhole 4 EA \ 12" x 1" Underdrain 2,847 LF \ 3/4-inch Crushed Limestone 6,557 TONS \ Finishing Stone for Synthetic Turf 5,739 TON \ Lawn Restoration 7,353 SY \ Sod 2,000 SY \ Green Synthetic Turf 49,317 SF \ Brown Synthetic Turf 45,522 SF \ Synthetic Turf Curb Edge 2,367 LF \ Reinstall 6' Chain Link Fence 1,464 LF \ Foul Poles 2 EA \ Base Anchor System 63 EA \ Anchor Plug 63 EA \ Pitch Pro 8121 Pitchers Mound 2 EA \ Dual Stanchion Pitcher's Rubber 6 EA \ Home Plate with Anchor and Stanchion 4 EA \ Hollywood Impact Double First Base 4 EA \ Jack Corbett Hollywood Base Set 5 EA \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashiers check made payable to the Owner in an amount of 5 percent of the Bidders maximum Bid price. All blanks must be filled in for the bid to be accepted. Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids which best serve the interests of the Owner. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price. The Work shall be substantially completed (field must be installed and playable) by May 15, 2024, with final completion by June 1, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |