Similar Projects
Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Chief Joseph Dam Debris Boom
Infrastructure
Design
$5,000,000 CJ est. value
Bridgeport, WA 98813

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

Chief Joseph Dam Spillway Sump Pumps and Controls
Infrastructure
Bidding
$5,000,000 CJ est. value
Bridgeport, WA 98813

Chief Joseph Dam Spillway Sump Pumps and Controls
Infrastructure
Bidding
$5,000,000 CJ est. value
Bridgeport, WA 98813

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

RFQ - Center Street Sidewalks Construction Services
Term Contract
Conception
Rock Island, WA 98850

US 97A/Knapps Hill Tunnel - Illumination Upgrades
Infrastructure
Design
$2,071,000 CJ est. value
Touhey, WA 98830

Last Updated 12/28/2022 03:01 AM
Project Title

3rd Street SE and Rock Island Road Intersection Improvements

Physical Address View project details and contacts
City, State (County) East Wenatchee, WA 98802   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,177,204 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Intersection of 3rd Street SE & Rock Island Road The Engineers estimated range of probable cost is $1,250,000 to $1,450,000. Proposals received after the time fixed for opening will not be considered. The major items of work include sawcutting; excavating and pavement removal; placing cement concrete curb and gutter, sidewalk, and curb ramps; HMA paving; installing traffic signal system poles, conduits, junction boxes, signal heads, and other equipment; pavement marking; Park and Ride reconstruction; and traffic control. All work shall be completed in accordance with the contract plans, special provisions, and the 2022 WSDOT/APWA Standard Specifications. Time for completion of the work is limited to 95 total working days. All work performed on the project will be subject to prevailing state wage rates. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, postal money order, or surety bond in an amount equal to at least 5 percent of the amount of the bid proposal. Checks shall be made payable to The City of East Wenatchee. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of East Wenatchee. The City of East Wenatchee reserves the right to reject any or all bids and to waive irregularities in the bid or in the bidding. Contractor shall assure to City of East Wenatchee that all services provided through this contract shall be completed in full compliance with the Americans with Disabilities Act (ADA) and Architectural and Transportation Barriers Compliance Board, Federal Register 36 CFR Parts 1190 and 1191, Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines; proposed rule, published in the Federal Register on July 23, 2004. No bidder may withdraw his proposal after the hours set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding forty-five (45) days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The major items of work include sawcutting; excavating and pavement removal; placing cement concrete curb and gutter, sidewalk, and curb ramps; HMA paving; installing traffic signal system poles, conduits, junction boxes, signal heads, and other equipment; pavement marking; Park and Ride reconstruction; and traffic control. All work shall be completed in accordance with the contract plans, special provisions, and the 2022 WSDOT/APWA Standard Specifications. Questions regarding the Specifications should be addressed to: Brent Powell, P.E., P.T.O.E., Project Engineer, Perteet Inc. brent.powell@perteet.com (206) 436-0517

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents