Similar Projects
Latex Overlay, Expansion Joint Replacement and Deck Repairs on the Structures SN 053-0124 and SN 053-0125
New Construction, Infrastructure
Bidding
IL

Create Project P3 Stage II
Renovation, Alteration
Bidding
Chicago, IL 60677

I-20-4722 Bridge Construction O`Hare To Westbound Il Rt 390 Ramp
Post-Bid
Less than $10,000,000 est. value
Downers Grove, IL 60515

Replace the Bridge Carrying CH 20 Over Quiver Creek and Roadway Reconstruction, Located 4.0 Miles Northeast of Havana
Post-Bid
Havana, IL

Bridge A32 & Grayland Station Repairs & Replacement
Renovation
Results
Chicago, IL 60601

Lemoyne Street Bridge Replacement
Results
Less than $600,000 est. value
Melrose Park, IL 60164

Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL

Grand Avenue Bascule Bridge and Viaduct Structural Repairs
Renovation, Infrastructure
Bidding
Chicago, IL

Bridge Replacement at Hawthorne Hills
Post-Bid
Elgin, IL

Replace the Bridge Carrying TR 266 Over Taylor Ditch, Located 2.5 Miles Southwest of Russellville
Results
Russellville, IL

Union Road Bridge
New Construction, Renovation
Bidding
IL

2021 Bridge Repair Program
Post-Bid
Oswego, IL

Bridge Deck Overlay on SN 002-0032 on IL 3 Over Sexton Creek, West of Gale
Results
IL

Improvements Located at the IDOT Birds Bridge Maintenance Yard at 22608 S
Renovation, Infrastructure
Bidding
IL

Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707

Reported 04/07/2022 12:00 AM
Project Title

Camelback Bridge Repairs

Physical Address View project details and contacts
City, State (County) Normal, IL 61761   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on Virginia Avenue, beginning approximately 130 feet East of the intersection with Hillcrest Street, extending 120 feet eastward, including Camelback Bridge (existing Structure No. 057-7821) which carries Virginia Avenue over Constitution Trail. The project work consists of removing and replacing all cross-bracing rods and turnbuckles at piers, retrofitting the top of all pier columns to shed water, removing and replacing concrete encasement at Piers No. 3 and 4 to extend the top of concrete above grade, replacing the missing expansion joint filler in retaining walls, cleaning and painting existing painted structural steel, metal railing, and new structural steel, resurfacing the timber bridge deck and bridge approach pavement, and repairing timber bridge railing and steel backed timber guardrail, and all necessary incidental work

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents