Similar Projects
Maintenance & Operations Facility - 2017 Bond - Socorro Independent School District
New Construction, Infrastructure
Design
$10,610,000 CJ est. value
El Paso, TX 79901

Idea Public Schools Edgemere Portable Classroom Relocation
Renovation
Design
$600,000 est. value
El Paso, TX 79938

Bottle Filling Stations
Renovation
Bidding
$45,000 CJ est. value
El Paso, TX 79901

Construction of the Montwood High School Campus Improvement
New Construction
Post-Bid
El Paso, TX

District Wide Portable Buildings Relocation
Post-Bid
El Paso, TX 79925

New Student Activity Complex
New Construction
Results
El Paso, TX

Single Step Process for BP1910 Rio Bravo MS, Parkland HS and Ysleta HS Upgrades and Renovations
Renovation
Results
$22,000,000 est. value
El Paso, TX 79907

Interior Alterations to Ysleta Middle School
Renovation - 11,550 SF
Pending Verification
$250,000 CJ est. value
El Paso, TX 79907

YISD Administration Building Renovation - Clinic
Renovation - 4,496 SF
Pending Verification
$674,400 CJ est. value
El Paso, TX 79925

Andress High School Renovations
New Construction, Renovation, Infrastructure
Design
$24,708,613 CJ est. value
El Paso, TX 79938

Hanks Middle School - Package 2 (General Construction)
New Construction
Post-Bid
El Paso, TX 79936

Single Step Process for BP1907 Riverside HS CTE Additions and Renovations
Renovation, Addition
Results
$22,000,000 est. value
El Paso, TX 79915

Exterior Site Improvements to Ysleta Middle School
Infrastructure, Renovation - 211,812 SF
Design
$300,000 CJ est. value
El Paso, TX 79907

New Combo School - Eastlake
New Construction
Post-Bid
El Paso, TX 79928

Construction of El Paso High School Historic Preservation and Renovation Project
Renovation
Results
$15,500,000 est. value
El Paso, TX 79902

Last Updated 01/19/2023 05:06 PM
Project Title

New Main Canopy & Administration Area Remodel to Ysleta Middle School

Physical Address View project details and contacts
City, State (County) El Paso, TX 79907   (El Paso County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New main canopy and alterations to administration area within an existing school building. As of January 19, 2023, the architect is trying to finalize the drawings and submit for permit. A timeline for bidding and construction has yet to be announced.

Details

6,423 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents