Similar Projects
Underground Utility Contractors for Residential Water Main Extensions
Infrastructure
Bidding
$700,000 est. value
Ocala, FL

Advanced Metering Infrastructure Program
Post-Bid
Clewiston, FL 33440

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

CDBG University Square Water Replacement
Results
Temple Terrace, FL 33617

Gate Valves
Post-Bid
Palm Bay, FL

Construction Manager (CM) for Town Wide Overhead Utility Under Grounding Program - Phase Five, North and South
Results
West Palm Beach, FL 33401

Slid US-98 Water Main Improvements
Post-Bid
$275,000 to $375,000 est. value
Sebring, FL

Poinciana Service Area Utility Construction Neighborhood 2 West, Village 7
Results
$3,100,000 est. value
Kissimmee, FL 34741

South Bermuda - Parkway Reuse Interconnect and Judge Farms Finished Pipeline
Post-Bid
Kissimmee, FL

Fire Hydrant Repairs
Results
Less than $138,125 est. value
Mexico Beach, FL 32410

Southwest Water Treatment Plant 30-Inch Raw Water Line Replacement
Post-Bid
Kissimmee, FL

KLFR and EMS District Phase 9 FY 20-21 Fire Hydrant Project
Results
Less than $134,750 est. value
Key Largo, FL 33037

Reported 05/28/2022 12:00 AM
Project Title

FSU Backflow Preventers Inspection and Maintenance / Repair Services

Physical Address View project details and contacts
City, State (County) Tallahassee, FL   (Leon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase order (PO) and/or contract with a Respondent to provide the labor and materials required to test approximately 275 backflow preventers and provide the necessary maintenance and repair needed as a result of test finding throughout FSU Campuses and FSU managed properties in the Tallahassee area. The repair and maintenance will be required only for the deficiencies found during testing, NOT any maintenance outside of the annual testing

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents