Similar Projects
Southwest Regional Pond Phase 1
Results
Less than $6,195,466 est. value
Fargo, ND 58102

2021 Box Culvert
Post-Bid
ND

Oak Grove Flood Risk Management
Results
$7,518,681 est. value
Fargo, ND

Riverwood Flood Risk Management
Results
$3,196,053 est. value
Fargo, ND

Box Culvert
Results
$1,419,405 est. value
ND

Elm Circle Flood Risk Management
Results
$991,522 est. value
Fargo, ND

Royal Oaks and River Drive Flood Risk Management
Results
$1,103,464 est. value
Fargo, ND

Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Drain 27 - Sources Sought
Post-Bid
$5,000,000 to $10,000,000 est. value
Fargo, ND

Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Southern Embankment Reach SE-2A
Term Contract
Post-Bid
$10,000,000 to $25,000,000 est. value
Fargo, ND

Cass County Drain No. 2 Improvement
Infrastructure
Results
West Fargo, ND

2021 Cass County Drain No. 40 Channel Improvements
Infrastructure
Results
$743,350 est. value
West Fargo, ND

Osgood Golf Course Slope Stability Improvements
Infrastructure
Bidding
$440,000 est. value
Fargo, ND 58104

Storm Drain Lining at Federal Courthouse
Term Contract
Design
$25,000 to $100,000 est. value
Fargo, ND 58102

Structure Replacement - Box Culvert Replacement
Renovation, Infrastructure
Bidding
ND

Reinforced Box Culvert
Infrastructure
Bidding
ND

Last Updated 02/08/2022 04:16 PM
Project Title

Fargo Moorhead Metropolitan Area Flood Risk Management Project

Physical Address View project details and contacts
City, State (County) Fargo, ND   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The dam embankment will extend north from a point approximately ΒΌ mile east of the intersection of CR16 and CR17, adjacent to the existing Diversion Inlet Structure (under construction). The total length of the dam embankment is approximately 1-3/4 miles. The embankment material will come from the borrow ditch adjacent to the embankment. The project will also include removal of a portion of an existing gravel road and an existing abandoned water line, placement of riprap in ditches, and construction of new corrugated steel pipe culverts.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents