Similar Projects
Furnish and Install Emergency One-Touch Lockdown System
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Pittsburgh, PA 15212

Professional Lead-Based Paint Risk Assessment for the Manchester Neighborhood
Alteration
Post-Bid
Pittsburgh, PA 15289

Environmental Remediation Services
Term Contract
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Blight Removal Program
Demolition, Infrastructure, Alteration
Results
Less than $25,000 est. value
Wilkinsburg, PA

Demolitions - Penn Hills 2023, 8931-8933, 8933 1/2 Eastwood Road
Demolition, Infrastructure
Construction
$18,987 CJ est. value
Pittsburgh, PA 15219

Sub-Slab Vapor Testing for the Manchester Redevelopment
Alteration
Post-Bid
Pittsburgh, PA 15233

Demolition and Asbestos Abatement of Various Structures
Demolition, Alteration
Results
$40,000 est. value
Bridgeville, PA

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Various Boroughs and Townships Projects
Demolition, Infrastructure, Alteration
Results
$60,000 est. value
Bridgeville, McKees Rocks, Pittsburgh, PA 15136

2022 Demolition - North Versailles Township
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
North Versailles, PA 15137

906 Quaill Avenue Garage Demolition
Demolition, Infrastructure
Results
$10,000 CJ est. value
Pittsburgh, PA 15202

Demolition of Four Single Family Structures
Demolition, Infrastructure
Post-Bid
$80,000 CJ est. value
Plum, PA 15239

Act 152 Demolition - Borough of Braddock
Demolition, Infrastructure
Results
$41,500 CJ est. value
Braddock, PA 15104

Deep Cleaning / Disinfecting of Facilities
Term Contract
Post-Bid
Pittsburgh, PA 15219

Last Updated 07/18/2023 06:31 AM
Project Title

Boyce Park Water Storage Tank Chlorine Residual Control System

Physical Address View project details and contacts
City, State (County) Monroeville, PA 15146   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,142,595 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Boyce Park Water Storage Tank Chlorine Residual Control System Project Cost Estimate: Contract Number 2023-4 -General/Mechanical = $650,000 Contract Number 2023-5 - Electrical = $100,000 Contract Number 2023-6- HVAC = $50,000 Bids will be accepted only from Bidders who have obtained official sets of Bidding Documents from Bankson Engineers, Inc. and who are on Bankson Engineers, Inc.s list of planholders. The Bid Proposals must be a paper copy, with an original signature, submitted in an envelope along with the original bid security, all as described in the Instructions to Bidders. Each proposal shall be accompanied by a certified check, cashier's check, or bidder's bond in favor of Monroeville Municipal Authority in the amount of not less than ten percent (10%) of the amount of the proposal. This project is subject to the provisions of the Pennsylvania Prevailing Wage Act. Workers must be paid not less than the prevailing minimum wages as established by the Pennsylvania Department of Labor and Industry, as shown on the applicable schedule. No bid may be withdrawn for a period of sixty (60) days after the scheduled closing time for the receipt of bids. The Authority reserves the right to reject any and all bids and to waive any informality in bids received. Furnish and install new electrical service, including ductbanks, conduit, wiring, etc. 2) All building and tank powervent power distribution, lighting, switches, receptacles, grounding, conduits, wire, etc Furnish and install new electrical service, including ductbanks, conduit, wiring, etc. 2) All building and tank powervent power distribution, lighting, switches, receptacles, grounding, conduits, wire, etc All questions about the meaning or intent ofthe Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bid Result HVAC McRANDAL COMPANY INC-$56,595 GENERAL/MECHANICAL SE CONSTRUCTION Group-$879,000 ELECTRICAL WAGNER ELECTRIC AND CONSTRUCTION-$207,000

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents