Similar Projects
Stay Open Hotel
New Construction, Renovation, Addition
Conception
San Diego, CA 92101

Pechanga Arena Redevelopment
New Construction, Renovation
Conception
San Diego, CA

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

Brown Bear Lodge & Conference Center
New Construction - 131,800 SF
Design
$10,000,000 CJ est. value
Mariposa, CA 95338

Raising Cane's #510
New Construction - 3,198 SF
Post-Bid
$400,000 to $500,000 est. value
Carson, CA 90746

Raising Cane's #474
New Construction - 3,860 SF
Post-Bid
$750,000 to $1,000,000 est. value
Barstow, CA 92311

Makers Quarter Masterplan
New Construction
Pending Verification
San Diego, CA 92101

Atari Hotel
New Construction
Pending Verification
San Jose, CA

Google Downtown West
New Construction - 684,000 SF
Conception
$10,000,000 CJ est. value
San Jose, CA 95130

601 West Beech Apartment Tower
New Construction
Design
San Diego, CA 92101

Mira Mesa Shopping Center
New Construction - 18,852 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92126

Atari Hotel
New Construction
Pending Verification
San Francisco, CA

Hollywood Center Mixed Use Development
New Construction
Conception
Los Angeles, CA 90028

Bank of Italy Building
Renovation
Design
San Jose, CA 95113

Raising Cane's #517
New Construction - 3,881 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Escondido, CA 92029

Reported 01/22/2021 12:00 AM
Project Title

Target #T0307 - Remodel

Physical Address View project details and contacts
City, State (County) Cathedral City, CA 92234   (Riverside County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Qualified Bidding.
Project Status Bidding by Invitation, All GC Bids Received, Selection Expected April 2021, Construction Start Expected April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Food/Beverage Service, 1 Story Above Grade, 1,400 SF Renovation.
Division 02 - Existing Conditions, Demolition.
Division 05 - Metals, Structural Metal Stud Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Wall Panels.
Division 09 - Finishes, Supports for Plaster and Gypsum Board, Non-Structural Metal Framing, Non-Structural Metal Stud Framing, Acoustical Ceiling Suspension Assemblies, Resilient Flooring, Resilient Tile Flooring, Access Flooring, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents