Similar Projects
Coastal Storm Risk Management Project, Flagler Beach Initial Nourishment 2020, Flagler County, Florida
Design
$10,000,000 to $15,000,000 est. value
Flagler Beach, FL 32136

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Post-Bid
$10,000,000 to $20,000,000 est. value
Miami, FL

Fisherman's Landing Shoreline Protection and Parking Improvements
Results
Less than $580,000 est. value
Sebastian, FL 32958

Drainage
Results
Less than $1,387,468 est. value
FL

Stormwater Pond Bulkhead Improvements
Post-Bid
FL

Roadside Ditch Cleaning and Rehabilitation - Pre-Qualified Horizontal Construction
Term Contract
Results
Less than $1,069,547 est. value
Jacksonville, FL 32202

Continuing Services (as Needed) for the Construction of Seawalls Citywide
Term Contract
Post-Bid
Less than $1,500,000 est. value
Miami, FL 33139

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

Whirlpool Road Dirt Road Paving Driveway Pipe
Post-Bid
FL

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Drainage Improvements Gladeview Area Phase I-A and Phase II
Post-Bid
Less than $1,140,058 est. value
Miami, FL 33128

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Seven Dwarfs Lane and Princess Way Drainage Improvements
Results
Less than $204,106 est. value
Kissimmee, FL 34741

Last Updated 12/20/2021 03:35 PM
Project Title

24th Street NW Drainage Improvements

Physical Address View project details and contacts
City, State (County) Bartow, Winter Haven, FL 33888   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of storm drainage system replacement and improvements along 24th Street NW and 23rd Street NW. The project consists on the removal of approximately 750 LF of 18” CMP pipe and installation of approximately 700 LF of 18” RCP and 155 LF of CMP pipe, construction of new driveways, MES and drainage swales, and installation of 10 inlet structures. The project will require the removal of 5 trees, including a 90” tree located on the SE corner of lot #45. All disturbed areas will need to be stabilized with sod.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents