Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

Cedar Falls West Viking Road Industrial Park Phase V
Addition, Infrastructure - 180,675 SF
Bidding
Cedar Falls, IA 50613

2022 Detention Tank Rehabilitation
Infrastructure
Bidding
$120,800 est. value
Breda, IA

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

Pottawattamie County Election's Building Parking Lot
Infrastructure
Post-Bid
Council Bluffs, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

Martha L. Miller Drive East Extension
Infrastructure
Bidding
Pleasant Hill, IA 50327

Meskwaki Pedestrian Trail
Infrastructure
Post-Bid
Tama, IA

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Last Updated 02/03/2022 09:20 AM
Project Title

2022 Rainbow Drive Improvements

Physical Address View project details and contacts
City, State (County) Sheldon, IA 51201   (O'Brien County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $712,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the construction of approximately 4,411 S.Y. Modified Subbase, 6” 735 C.Y. Excavation, Class 10 4,411 S.Y. Subgrade Preparation, 6” 4,411 S.Y. Subgrade Treatment, 18” 1,230 L.F. Storm Sewer, RCP 16 EA. Precast Storm Structures 3,895 S.Y. Pavement, PCC, 7” 701 S.Y. Driveway & Sidewalk, PCC and other related construction work

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents