Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

Block 34 Park Improvements Project
Infrastructure
Bidding
$13,500,000 CJ est. value
Stillwater, OK 74074

Recovered Water Pump Station and Finished Water Pump Station
Infrastructure
Bidding
$43,300,000 CJ est. value
Stillwater, OK 74075

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Energy Services Water Line Repairs
Term Contract
Construction
$250,000 CJ est. value
Stillwater, OK 74077

Dutch Bros / Stillwater
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Stillwater, OK 74074

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Full Conversion Crude Oil Refinery Development / Chicago
New Construction, Infrastructure
Pending Verification
$5,560,000,000 CJ est. value
Cushing, OK 74023

Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Stillwater, OK 74074

Asphalt Overlay - 300/400 Block of Main Street
Infrastructure
Bidding
$145,000 CJ est. value
Glencoe, OK 74032

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Last Updated 10/18/2023 02:35 AM
Project Title

7th Avenue Roadway and Utility Improvements

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

7th Avenue Roadway And Utility Improvements From Main Street To Lewis Street Scope of work to primarily include the following: Full depth pavement reconstruction of approximately 390 LF of 7th Avenue between Main Street and Lewis Street and approximately 190 LF of Alleyway. Project also includes construction of approximately 390 LF of 10"HDPE directional drilled waterline, 85 LF of 8" PVC waterline, 420 LF of 4" PVC waterline, and miscellaneous appurtenances; as well as approximately 300 LF of 10" PVC sanitary sewer and replacement of 3 manholes. Miscellaneous site work, clearing, and grading is also included with the project. Final quantities will vary. Questions regarding the design of the project may be submitted to the City of Stillwater through the online portal, https://stillwater.ionwave.net. All questions must be received one week (7 days) prior to the bid opening. Question Deadline 10/18/2023 at 4:00 PM CT

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents