Similar Projects
SLCC JC HTC Renovation F2033
Renovation
Bidding
$1,030,000 est. value
West Jordan, UT 84088

Helix Building
New Construction - 250,000 SF
Sub-Bidding
$78,439,728 est. value

Health Sciences Campus Office Building
Post-Bid
Less than $78,439,728 est. value
Salt Lake City, UT

Building 565-EEJMRB Vivarium Expansion
Renovation - 8,300 SF
Post-Bid
Less than $3,200,000 est. value
Salt Lake City, UT 84112

Construction Management / General Contractor - BPRB Level 1 Lab Remodel
Renovation - 14,000 SF
Results
Less than $4,933,402 est. value
Salt Lake City, UT

Fieldhouse Seismic Upgrade
Term Contract
Results
Less than $2,409,976 est. value
Salt Lake City, UT

Science and Industry Building, 3rd Floor Laboratory Remodel
Renovation
Construction
Salt Lake City, UT 84123

Uu Meb Bldg Ece Lab Remodel Phase 2
Construction
Less than $491,794 est. value
Salt Lake City, UT 84112

CMGC Building 525 1st Floor East Side Radiology Backfill
Demolition
Post-Bid
$2,290,478 est. value
Salt Lake City, UT 84112

Union Building Student Success Suite - Tenant Improvement
Results
Less than $643,177 est. value
Salt Lake City, UT 84112

Gillmor Hall Addition
Addition - 335,606 SF
Construction
$8,500,000 est. value
Salt Lake City, UT 84105

Med X - Wall Panelization
Renovation - 2,500 SF
Post-Bid
Less than $129,285,000 est. value
Salt Lake City, UT

Hybrid Operating Room - CMGC
Term Contract
Results
Salt Lake City, UT 84112

CMGC - Relocate OB Emergency and Build 3 New Labor Delivery Rooms
Construction
Less than $1,578,828 est. value
Salt Lake City, UT 84112

HEB 3rd Floor SE and 4th Floor SE Lab Renovation
Renovation
Post-Bid
$100,000 est. value
Salt Lake City, UT 84112

Last Updated 03/04/2020 11:41 AM
Project Title

HEB Phases 3 and 4 Lab Renovations 3rd Floor East North Tower

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84112   (Salt Lake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $120,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 3 Lab Project Scope: 3rd floor East 1.Demolition and reconstruction of existing laboratories to create new and efficient lab spaces that comply with current safety code standards and current research methodologies. Equipment coordination and chemical storage are major design considerations. Major construction challenges will be the complexities surrounding the pre-demolition of surface mounted lab utilities prior to abatement demolition and minimizing shutdown impact to other building occupants. 2.Examples of lab basis of design can be found on our campus in the new Thatcher Building (87 TBBC) and the 3rd floor West Lab area, which is under construction now. Emergency power will need to be provided for these renovated spaces to eliminate costly insurance claims for ruined equipment in the occurrence of unplanned power outages. Phase 4 Lab Project Scope: 2nd floor SW Quadrant and 4rth floor SE Quadrant 1.Demolition and reconstruction of existing laboratories to create new and efficient lab spaces that comply with current safety code standards and current research methodologies. Equipment coordination and chemical storage are major design considerations. Major construction challenges will be the complexities surrounding the pre-demolition of surface mounted lab utilities prior to abatement demolition and minimizing shutdown impact to other building occupants. Project #22143_HEB 3rd Floor Lab Renovation, FLCC $2,727,438.00 Project # 22307 HEB 4th SW & 2nd SE Floor East Lab Renovation, FLCC $2,783,574 Project # 22308 HEB North Tower SE Quadrant Roof Replacement, FLCC $658,031

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents