Similar Projects
PIP-II Site Work
Post-Bid
Batavia, IL

Site Paving
Post-Bid
Elgin, IL 60120

Hamlet Park and Playground Renovation
Renovation
Results
Batavia, IL 60510

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Hughes Creek Golf Course Parking Lot Removal and Replacement
Results
Elburn, IL 60119

South Mill Creek Community Park Sand Volleyball Courts
Post-Bid
Batavia, IL

Curb and Gutter, Sidewalk and Driveway Replacement, Pavement Patching and Parkway Restoration
Results
Bartlett, IL

2021 Street Program
Post-Bid
Elburn, IL

RR-21-4576 - Plaza Improvements
Results

Roadway Resurfacing
Post-Bid
Saint Charles, IL

Chip Seal Parking Lot and Roadway Improvements
Results
Elgin, Saint Charles, IL 60175

2021 Polk Avenue Roadway and Utility Improvement
Post-Bid
Carpentersville, IL

Last Updated 08/10/2022 09:07 AM
Project Title

Garden Club Park Development

Physical Address View project details and contacts
City, State (County) Geneva, IL 60134   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally includes removals, earthwork, installation of concrete paving, unit pavers, seat walls, metal trellis, metal entry arch, site furniture, landscaping, and lawn restoration Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All contracts for work herein are subject to all Park District rules and regulations and providing for the payment of Kane County's prevailing wage rate to all workers involved in these projects. All bids will remain firm for 60 days after the bid opening. The Geneva Park District reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Park District.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents