Similar Projects
JEFCO 2021 Chiller Replacements for Clay Chalkville High School Oak Grove High School and Oak Grove Elementary School
Post-Bid
Bessemer, Pinson, AL 35126

Shades Cahaba Elementary School HVAC Replacements
Post-Bid
$176,500 est. value
Homewood, AL 35209

UAB Quarterback Tower AHU-2 Replacement
Results
$1,874,600 est. value
Birmingham, AL

Electrical, Plumbing, and Compressed Air Services
Results
Birmingham, AL

Cudworth Building Connection to Chilled Water - Phase 3
Post-Bid
$85,000 to $115,000 est. value
Birmingham, AL 35233

ALEA HVAC Maintenance and Repair
Results
Alexander City, Birmingham, AL 35204

Home Weatherization Services
Post-Bid
AL

Highlands HVAC Replacement
Results
$450,000 est. value
Birmingham, AL 35233

Residential HVAC Installation and Miscellaneous Repair
Term Contract
Post-Bid
Birmingham, AL

Birmingham City Schools HVAC Upgrades
Results
Birmingham, AL

Purchase and Installation of Source Capture Removal Systems
Post-Bid
Irondale, AL

Crestline Elementary School 2021 Rooftop Unit Replacement
Results
$382,499 est. value
Mountain Brook, AL 35213

Shelby B40 - Imaging Equipment Cooling
Post-Bid
$60,000 to $70,000 est. value
Birmingham, AL 35233

HVAC Upgrades for the Midfield City Schools
Alteration
Results
Midfield, AL 35221

HVAC Water Treatment Services
Term Contract
Post-Bid
Birmingham, Center Point, AL 35203

Last Updated 06/20/2022 04:37 AM
Project Title

HVAC Equipment Replacement Birmingham and Bessemer Campuses

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 to $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the replacement of nine (9) existing rooftop units with new packaged gas/electric rooftop units at the Birmingham Campus. The project also includes replacing four (4) existing air handlers with four (4) new fan-coil units in existing mechanical rooms and the replacement of fourteen (14) existing water-source heat pump units in existing mechanical rooms at the Bessemer Campus.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents