Similar Projects
Sewer Force Main Replacement
Infrastructure
Bidding
Pueblo, CO

2022 Preventive and Critical Lining, Phase 1
Infrastructure
Bidding
$3,700,000 to $4,100,000 est. value
Denver, CO

Emergency Sanitary Sewer Point Repair
Term Contract
Post-Bid
Pueblo, CO

Airpark North Phase 1 Public Infrastructure Project
Post-Bid
Loveland, CO

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

2022 Sanitary Sewer Rehabilitation Project
Infrastructure
Bidding
Englewood, CO

Commercial Kitchen Grease Trap System
Infrastructure
Post-Bid
Cortez, CO

2020 Manhole Rehabilitation Project
Results
Boulder, CO

Prairie Song Metropolitan District Filing 1 Development and Offsite Utilities Projects
Infrastructure
Post-Bid
Lakewood, CO 80227

Wastewater Collection System Slip Lining
Results
Glenwood Springs, CO 81601

Sewage Connection Project
Term Contract
Post-Bid
Aspen, CO

2020 Cured-In-Place Pipe Project
Results
Pueblo West, CO 81007

Last Updated 02/28/2022 01:44 PM
Project Title

2021 Water and Sewer Improvements

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the following major items: 1. Cleaning, video, and rehabilitation of approximately 3,900 lineal feet of 12-inch sewer main, 1,200 lineal feet of 15-inch sewer main, and 2,700 lineal feet of 18-inch sewer main by installation of a cast-in-place-pipe (CIPP) liner. 2. Associated bypass pumping. 3. Where identified by the Owner, seal and rehabilitate existing manholes as specified. 4. Removal and replacement of approximately 1,660 lineal feet of 6-inch water main, and 25 lineal feet of 8-inch water main. 5. Associated temporary service, valves, fire hydrants, connections, and asphalt pavement replacement. 6. Replacement of one pressure regulating valve and associated interior piping.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents