Similar Projects
Lakeside Park Restroom Grinder Pump Station and Sanitary Sewer
New Construction, Infrastructure
Post-Bid
$50,000 est. value
Rowlett, TX

Terminal D SS Lift Stations
Renovation
Post-Bid
$2,596,645 est. value
Dallas, TX

Sherwood Wastewater Lift Station & Various Upgrades
Results
Cedar Hill, TX 75104

Gillion Pump Station Improvements Electrical Upgrade
Results
$585,000 est. value
Dallas, TX 75200

Highland Park Meter Station Rehabilitation
Results
$313,800 est. value
Highland Park, TX 75205

Southwest Sector Pump Station - Phase 2
Results
$8,000,000 to $9,000,000 est. value
Grand Prairie, TX 75050

Danieldale Pump Station Rehabilitation - Phase 1 Construction
Results
Duncanville, TX 75137

Walcrest Pump Station and Walnut Hill Pump Station Site and Security Improvements
Results
$1,819,744 est. value
Dallas, TX 75201

High Service Pump Station Pumping Unit Replacement
Results
Dallas, TX 75235

Matthew Holzapfel Pump Station
Results
Less than $12,745,860 est. value
Mesquite, TX

Robinson Road Pump Station
Results
$8,615,000 est. value
Grand Prairie, TX 75050

Lift Station - Fireside by the Lake, Phase 1
Results
Dallas, TX 75295

Addison Kellway Lift Station By-Pass Project
Results
Addison, TX 75001

LEFIS Lift Station Valve and Pump Stand Replacement
New Construction
Results
$150,000 est. value
Seagoville, TX

Desoto Chloramine Booster Facilities
Addition
Results
$1,000,000 to $1,200,000 est. value
DeSoto, TX 75115

Last Updated 12/14/2021 10:29 AM
Project Title

Sandy Lake Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Coppell, TX   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,466,574
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 6.15 MGD Sandy Lake Lift Station (SLLS) inclusive of yard piping, electrical improvements, site improvements, decommissioning of the existing lift station, permanent flow meter installation at six sites.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents