Similar Projects
58th Avenue (from North of 57th Street to 85th Street) Full Depth Reclamation
Bidding
Less than $7,000,000 est. value
Vero Beach, FL 32960

Design and Performance of Open-Graded Friction Course (OGFC) Mixtures Containing Epoxy Asphalt
Results

Pavement Markers: Raised and Reflectorized and Related Materials (Supplemental Bid)
Term Contract
Results

Asphalt Maintenance and Repairs
Results
Less than $500,000 est. value

Concrete Bulkhead Wall
Results
Less than $5,111,725 est. value
FL

Old Dixie Highway and Highland Drive Intersection Improvements
Results
Less than $382,423 est. value
Vero Beach, FL

Roadway Paving
Term Contract
Results
Sebastian, FL

Vero Lakes Estates 85th Street Millings from 101st Avenue to 96th Avenue
Results
Vero Beach, FL

Annual Bid for Asphalt Repaving and Resurfacing
Term Contract
Results
Vero Beach, FL 32960

Milling Paving Concrete On-Call Contractor
Results
Indian River Shores, FL

Indian River Boulevard and Grand Harbor Boulevard Signalization - IRC-1806
Results
$481,781 est. value
Gifford, FL 32961

Annual Street Resurfacing
Term Contract
Results
Less than $500,000 est. value
Vero Beach, FL 32960

SR 60 and 43rd Avenue Intersection Improvements
Results
$13,388,523 est. value
Vero Beach, FL 32968

Asphalt Repair
Results
Less than $600,000 est. value

Miscellaneous Construction
Results
Less than $1,000,000 est. value

Last Updated 08/01/2019 04:27 AM
Project Title

49th Street Milling and Resurfacing (58th Avenue to 31st Avenue)

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32967   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project will be performed to resurface 49th Street from 58th Avenue to 31st Avenue. The proposed improvements include milling of existing pavement, installation of superpave asphaltic concrete, curb and gutter, guardrail upgrades, sodding, and installation of thermoplastic pavement markings. This project is an F.D.O.T. Small County Outreach Program (SCOP) funded project, FM No. 436850-1-54-01. Estimate under $1 million
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents